top of page

Three Phase off Grid
This system is a three phase off grid project

Hybrid system - backup battery
Residential site with 16 Kw and backup backup to essential services

Building a three phase system
Building a three phase system at St Albans NSW

Three phase off grid - Picton NSW
Three phase system located at Picton NSW

Hunter Valley - single phase
Single phase off grid at Hunter Valley NSW

Typical off grid control pane;

Generator Installation

Generator Installation

Hybrid battery backup
12 kW solar array with 13 kWh of battery backup to essential services such as power ,light and water pump.
bottom of page